Nut Polishing Drum

Quantity          : One (1) unit.

Type                : Rotary, without roller sprocket.

Power              : 7.5 Kw/ 10 Hp Teco, Electrim electromotor and Brook Hansen or equivalen

Drive               : Chain duplex RS 160.

Speed              : 16 rpm

Capacity          : 6 tons nut/hour

Construction   :

  • Fabricated from 9 mm thick m.s plate.
  • Fitted of 8” dia. steam pipe schedule 80.
  • Fitted with internal buffle plate of 9 mm thick m.s plate and lifting bar mounted on a central shaft.
  •  Drum would be perforated with suitable sizes to drop the nuts into a pneumatic nut transport system.
  • Larger particles such as stones, bunch stalks would be overflow from end of the polishing drum.

Dimension       : Approximately 1.000 mm diameter and 5.000 mm in length.

Accessories     :

  • An m.s collecting tray for recovery broken kernels and small stone particles.
  • Nut cross conveyor dia. 300 mm c/w drive.

Nut Polishing Drum

Iklan

Depericarper Vertical Column

Quantity          : One (1) unit.

Type                : Induced draught.

Capacity          : 36 tons FFB/hour.

Construction   :

  • Fabricated from 5 mm thick m.s plate.
  • Cross section of column would be rectangular and could be adjusted to vary areas for controlling air speed by means of a sliding back plate.
  • Fitted with toughened glass inspection window.
  • Structure from 100 x 100 x 10 mm m.s angle bar.

Dimension       : 800 mm x 800/1.000 mm cross section of column x 4.000

mm height approx.

Depericarper Vertical Column

Cake Breaker Conveyor

Quantity : One (1) unit.
Type : Semi scroll, unjacketed model screw.
Speed : Two (2) unit 70 and 80 rpm respectively.
Capacity : 36 tons FFB/hour, each.
Construction : The conveyor would be multi section, flanged joint to form a continuous length.
• Shell 8 mm thick m.s plate and side plate would be extended 400 mm high constructed with 6 mm thick m.s plate.
• Stiffener : 70 x 70 x 7 mm m.s angle bar welded to the edge.
• Wear plate : 6 mm thick m.s plate.
• Semi scroll : 9 mm thick m.s plate.
• Shaft : 3” dia. steam pipe schedule 80.
• Bearing : Used roller bearing self lubricating.
• End plate & Flange : 9 mm thick m.s plate.
• Final section : Consist of a worm screw fitting closely inside a split circular casing.
• A catwalk and maintenance platform would be provided along entire length of the cake breaker conveyor c/w ladder 1” and ¼” dia. black steel pipe handrail.
• Provided with ornamesh removable cover along its entire length.
• Unit drive : One (1) unit driven by 11 kW/ 15 Hp, 80 rpm geared motor. (prefer 15 kw u 80 rpm)
Make : Teco, Electrim electromotor and Brook Hansen gearbox or approved equivalent.
Dimension : Diameter; 800 mm x ± 22.000 mm.

Cake Breaker ConveyorCake Breaker Conveyor

Despatch Sheed

Quantity : One (1) unit.
Capacity : Two (2) units’ tankers’ at any time.
Construction :
” Steel structure column fabricated from IWF 200 x 100 mm.
” Provided with tie beam of IWF 150 x 75 mm.
” Span fabricated from 125 x 75 x 20 3.2 mm lips channel c/w dia. 12 mm sag
rods.
” Alu zine 0.5 mm thick used for roofing.
” Provided with operation platform, with 5 mm thick m.s chequered plate c/w 1″ x 1ᄐ” dia. Black steel pipe hand rail.
” Footing foundation of reinforced concrete mix K 225 c/w ground beam 20/30.
” Floor would be constructed with a 150 thick casted concrete reinforced with
two (2) layer of BRC M-6.
” Provided with two (2) no’s 6″ dia. discharge pipe c/w valve.
Dimension : 6.000 mm wide x 8.000 mm length floor area.

Despatch Sheed

Despatch Oil Pump

Quantity :Two (2) units’.
Type : Rotary vane, Positive displacement.
Capacity : 50 tons/hour
Total head : 20 m
Pump speed : 500 rpm
Casing : Cast iron.
Rotor : Stainless steel.
Shaft : Stainless steel.
Seal : Mechanical, ball bearing construction.
Vane : Self adjusting for wear sliding.
Unit drive : Driven by 7,5 kW/ 10 Hp electromotor Teco, Electrim or equivalent through pulley and v-belt.
Accessories :
• A remote control valve.
• A return line pipe c/w valves and fittings to the clarification station.
Make :
• Blackmer or equivalent
• Oil collected below screen 3 mm thick of m.s plate would be provided and
discharge oil to crude oil tank.

Despatch Oil Pump

Palm Oil Storage Tanks

2 units of palm oil storage tanks of mild steel welded construction will be constructed.
Capacity : 2 x 2,000 tons of CPO.
Dimension : Ø 17,466mm I/D x 10,062mm H.
Bottom plate : 10 mm m.s. plate.
Shell plate : 1st course 9mm. m.s. plate.
: 2nd course 9mm. m.s. plate.
: 3rd course 8mm. m.s. plate
: 4th course 8mm. m.s. plate
: 5th course 6mm. m.s. plate
: 6th course 6mm. m.s. plate
• Bottom slope to a center sump from which oil is pumped and bottom drained.
• One of tank fitted with external spiral access ladder.
• Provided with internal ladder.
• Interconnecting catwalk between tank of 600mm wide c/w dia. 1” and 1¼” black pipe hand rail would be provided.
• Provided with 500mm dia. Roof manhole with cover.
• Roof perimeter c/w handrail all round.
• One unit 600mm diameter side manhole at first stage.
• One unit 6” dia. Vent pipe at to of dome.
• On sounding pipe c/w float Stainless steel and external level indicator.
• Scale level will be including with Metrology certificate.
Roof plate : 5mm thick m.s. plate.
Accessories :
• Ø 2″ indirect steam heating coils + 8 blank flanges.
• Ø 3″ palm oil inlet valve & Ø 4″ outlet valve (body cast steel, shaft
• and seat stainless steel).
• Steam valve and steam trap FT ball float type Spirax Sarco for
• heating coils + thermostatic control.
• Level indicator.
• Drain pipe Ø 2.5″
• Thermometer 150mm dia.
• Recycling pipe to clarification, with sight glass.

Storage Tank

Clarification Structure

Quantity : One (1)
Function :Suitable to support the entire clarification tank and vacuum drier.
Construction :
Main structure of IWF 200x100x21.33 kg/m mild steel H beam column. Supported with 200 mm, 150 mm m.s channel Braced with 75x75x6 mm mild steel handle bar Fitted with maintenance platform and covered with 5 mm thick mild steel chequered plate c/w dia. 1” and ¼” black steel handrail. Provided with
access ladders and interconnected walkways. One (1) runway beam c/w three (3) tons chain block would be fitted above sludge separator center line.

Clarification Structure