1 (one) unit Fat Pit, 3 compartment (1 for suction pump ; 1 for sludge and 1 for condensate sterilizer) below ground level, will be provided and installed to receive sludge centrifuges and condensate sterilizer.
Pump will be self priming with tank and lay on ground position.
Type : Rectangular 3 (three) compartment under ground
Construction : Concrete.
• 1 compartment for pump 1.5m x 6.6m to install roofing 2m height.
• Provided round pit 40mm dia. black pipe hand rail.
Capacity : 60 m³
Dimension : 6.6m x 6.1m x 1.5m.
Accessories : A float switches control. Shelter with spandex 0.5 mm.